This project involved placing two new portable classrooms over a portion of their exising parking lot with structural tie downs to meet code, and tieing into existing infrastructure onsite, with major upgrades to electrical and plumbing. We also connected the buildings with an ADA ramp and landing to connect to existing walkways.